High-rise construction is one of the most significant and challenging areas of urbanization, often plagued by delays and exceeding costs.

CONCRETE ROOF DECKS
CONCRETE ROOF DECKS
CONCRETE ROOF DECKS

SCP TECHNOLOGY

The demand to stay ahead of schedule often leads contractors to avoid a lengthy curing process by spending more on high performance concrete and membrane coatings. However, these alternatives increase budgets and maintenance costs while offering a significantly shorter service life. For a solution that saves both time and money, Spray-Lock Concrete Protection (SCP) gives you waterproofed, high-performance concrete with a superior cure, all in one treatment.

SCP Accelerates Schedule with a Superior Cure for Tukwila’s First High-Rise

In the city of Tukwila, WA, just outside of Seattle, has experienced significant growth over the past decade. Washington Place, slated to be complete in 2017, will be the city’s first high-rise. Construction began on the 19-story, 418,000 ft2 building in 2014, and to accelerate the schedule of this large project, Absher Construction chose SCP Treatments to cure and waterproof several decks, creating “dry-slabs.” By doing so, they were able to avoid weather delays during construction, in addition to providing insurance against future problems caused by leaks throughout the service life of the mixed-use structure.

Once complete, Washington Place will be a major part of Tukwila’s city center. By using SCP Treatments, the contractors ensure that the concrete will be protected throughout its service life and require significantly less maintenance, all while keeping the project on schedule.

CONCRETE ROOF DECKS

Waterproof Below-Grade Shotcrete

Unlike positive side membranes, SCP Treatments are tested to 335 feet of head pressure and can waterproof below-grade retaining walls while they’re drying in the entire excavated area. Note: As part of a complete waterproofing system, joints, cracks and penetrations still need to be sealed.

Protect Roof Decks Instantly

When used at the time of pour, SCP Treatments can cure and waterproof your roof deck immediately and save you the additional installation and removal costs of a temporary roofing system.

Save Parking Garages Maintenance Costs

Durability testing and analysis shows SCP treatments perform better than traffic coatings and are far less expensive, and as a permanent part of the concrete itself, SCP Treatments won’t have to be replaced every 5 years.

Work as Hard as You Want

SCP Treatments are verified to penetrate depths from 2 to 8 inches, so you can start drilling holes for pole braces and formwork sooner, and since shrinkage is reduced by 60 to 80%, you will have fewer closure pours and control joints throughout the process.

Fast Track Projects

SCP Treatments act as a barrier from weather above, allowing finish trades to perform wall framing, electrical, drywall, hardware installation, etc. without waiting for exterior or upper level construction to finish.

Polish Concrete Sooner and Quicker

Slabs treated with SCP are ready for polishing in just 14 days, with fewer cracks and less curl. SCP Treatments also act as a hardener, meaning polishing can be done in a 1/3 less time without the need for additional silicate application.

Pour to Floor in 14 Days

SCP Treatments greatly reduce the release of free moisture to such a low level that flooring and coatings can be applied in as little as 14 days and are covered by Spray-Lock’s 15-year warranty.

AVERAGE SAVINGS USING SCP

SCP Treatments cost far less than sealers or high performance concrete, work with all types of mix designs, provide permanent protection and save you money throughout the installation and for decades to come.

Slab Access After Curing
Total Vapor Control
Moisture Mitigation
Waterproofed Roofing

CONCRETE PROTECTION PRODUCTS AT WORK

A PROVEN SOLUTION TO CONTINUAL FAILURE OF CONCRETE INFRASTRUCTURE.

SCP technology Rejuvenates concrete capillary and pore structure as well as waterproofs existing non-coated concrete. Stop moisture-related flooring failure permanently.